Men's Work Trip to Zephyr, September 2009 . Jalbum 8.5 Zephyr Sunset slides/Zephyr Sunset.html# Fri, 22 Jan 2010 09:51:27 -0800 Sunset seen from the Zephyr Point Presbyterian Conference Center, site of the Stone Church Men&#146;s Mission Work Trip, September 11&#150;14, 2009. (Photo by Dan Raby, earlier in 2009) Sunset seen from the Zephyr Point Presbyterian Conference Center, site of the Stone Church Men&#146;s Mission Work Trip, September 11&#150;14, 2009. (Photo by Dan Raby, earlier in 2009) slides/Zephyr Sunset.jpg DSC_0006 slides/DSC_0006.html# Fri, 22 Jan 2010 09:51:27 -0800 Our assignment: improve two decks at Cabin 103, aka &#147;the Pastor&#146;s Cabin&#148;. It is the highest one on the hill behind the office; getting ourselves and materials there involved considerable climbing. Note the intricate staircase. Our assignment: improve two decks at Cabin 103, aka &#147;the Pastor&#146;s Cabin&#148;. It is the highest one on the hill behind the office; getting ourselves and materials there involved considerable climbing. Note the intricate staircase. slides/DSC_0006.JPG DSC_0001 slides/DSC_0001.html# Fri, 22 Jan 2010 09:51:27 -0800 The &#147;High Deck&#148; adjacent to the living room needed to be completely rebuilt. The &#147;High Deck&#148; adjacent to the living room needed to be completely rebuilt. slides/DSC_0001.JPG DSC_0004 slides/DSC_0004.html# Fri, 22 Jan 2010 09:51:27 -0800 Leland and David remove decking, high above the ground below. Leland and David remove decking, high above the ground below. slides/DSC_0004.JPG DSC_0014 slides/DSC_0014.html# Fri, 22 Jan 2010 09:51:27 -0800 Lawrence, Art and Chris mix concrete for repairs to the &#147;Low Deck&#148; at the top of the staircase and adjacent to the cabin&#146;s hallway. Lawrence, Art and Chris mix concrete for repairs to the &#147;Low Deck&#148; at the top of the staircase and adjacent to the cabin&#146;s hallway. slides/DSC_0014.JPG DSC_0020 slides/DSC_0020.html# Fri, 22 Jan 2010 09:51:27 -0800 Fresh concrete is laid, to become a foundation for a post at the Low Deck. Fresh concrete is laid, to become a foundation for a post at the Low Deck. slides/DSC_0020.JPG DSC_0017 slides/DSC_0017.html# Fri, 22 Jan 2010 09:51:27 -0800 No lumber is wasted. Discarded rail and deck pieces are to be cut into short lengths for use in cabin fireplaces. Rod was quite busy with the chop saw throughout the weekend. No lumber is wasted. Discarded rail and deck pieces are to be cut into short lengths for use in cabin fireplaces. Rod was quite busy with the chop saw throughout the weekend. slides/DSC_0017.JPG DSC_0025 slides/DSC_0025.html# Fri, 22 Jan 2010 09:51:27 -0800 All that sawing raised quite a pile of sawdust!<br>(A tree&#146;s lament might be: &#147;Sawdust thou art, and unto sawdust thou shalt return.&#148;) All that sawing raised quite a pile of sawdust!<br>(A tree&#146;s lament might be: &#147;Sawdust thou art, and unto sawdust thou shalt return.&#148;) slides/DSC_0025.JPG DSC_0029 slides/DSC_0029.html# Fri, 22 Jan 2010 09:51:27 -0800 At the High Deck, all needed demolition has been done. Here Leland, Mark, David and Lawrence work to build a scaffold, from which they will begin the new structure. At the High Deck, all needed demolition has been done. Here Leland, Mark, David and Lawrence work to build a scaffold, from which they will begin the new structure. slides/DSC_0029.JPG DSC_0031 slides/DSC_0031.html# Fri, 22 Jan 2010 09:51:27 -0800 Leland, Mark and David check where to trim an old supporting beam on the High Deck. Leland, Mark and David check where to trim an old supporting beam on the High Deck. slides/DSC_0031.JPG DSC_0038 slides/DSC_0038.html# Fri, 22 Jan 2010 09:51:27 -0800 Lawrence, Chris and Art inspect their new supporting post, at the corner of the Low Deck. Lawrence, Chris and Art inspect their new supporting post, at the corner of the Low Deck. slides/DSC_0038.JPG DSC_0039 slides/DSC_0039.html# Fri, 22 Jan 2010 09:51:27 -0800 Gary, David and Mark at work on the High Deck. Gary, David and Mark at work on the High Deck. slides/DSC_0039.JPG DSC_0044 slides/DSC_0044.html# Fri, 22 Jan 2010 09:51:27 -0800 Chris fastens a new piece on the Low Deck. Chris fastens a new piece on the Low Deck. slides/DSC_0044.JPG DSC_0045 slides/DSC_0045.html# Fri, 22 Jan 2010 09:51:27 -0800 Stephen (R) takes a break from carrying lumber to the work site, while Bill saws scrap wood. Stephen (R) takes a break from carrying lumber to the work site, while Bill saws scrap wood. slides/DSC_0045.JPG DSC_0046 slides/DSC_0046.html# Fri, 22 Jan 2010 09:51:27 -0800 Bill raises yet another cloud of sawdust. Bill raises yet another cloud of sawdust. slides/DSC_0046.JPG DSC_0047 slides/DSC_0047.html# Fri, 22 Jan 2010 09:51:27 -0800 David pauses in his work on the High Deck. David pauses in his work on the High Deck. slides/DSC_0047.JPG DSC_0048 slides/DSC_0048.html# Fri, 22 Jan 2010 09:51:27 -0800 The power drills got a real workout this weekend! The power drills got a real workout this weekend! slides/DSC_0048.JPG DSC_0053 slides/DSC_0053.html# Fri, 22 Jan 2010 09:51:27 -0800 Chris takes his turn carrying lumber up that long stairway. Chris takes his turn carrying lumber up that long stairway. slides/DSC_0053.JPG DSC_0056 slides/DSC_0056.html# Fri, 22 Jan 2010 09:51:27 -0800 Chris packs four 4x4s for posts through the final doorway to the High Deck. Chris packs four 4x4s for posts through the final doorway to the High Deck. slides/DSC_0056.JPG DSC_0057 slides/DSC_0057.html# Fri, 22 Jan 2010 09:51:27 -0800 Gary and David appear, like beavers, above the supporting joists they just installed for the High Deck. Gary and David appear, like beavers, above the supporting joists they just installed for the High Deck. slides/DSC_0057.JPG DSC_0059 slides/DSC_0059.html# Fri, 22 Jan 2010 09:51:27 -0800 Gary, David and Mark do some final checking on the joists. Gary, David and Mark do some final checking on the joists. slides/DSC_0059.JPG DSC_0062 slides/DSC_0062.html# Fri, 22 Jan 2010 09:51:27 -0800 Mark notes that the High Deck appears ready for its flooring to be installed. Mark notes that the High Deck appears ready for its flooring to be installed. slides/DSC_0062.JPG DSC_0063 slides/DSC_0063.html# Fri, 22 Jan 2010 09:51:27 -0800 Another view of the High Deck. Another view of the High Deck. slides/DSC_0063.JPG DSC_0065 slides/DSC_0065.html# Fri, 22 Jan 2010 09:51:27 -0800 A Lake Tahoe scene, from near Cabin 103. A Lake Tahoe scene, from near Cabin 103. slides/DSC_0065.JPG DSC_0071 slides/DSC_0071.html# Fri, 22 Jan 2010 09:51:27 -0800 David pauses as installation of High Deck flooring begins. Note how it runs at a 45 degree angle to the joists, to increase structural strength. David pauses as installation of High Deck flooring begins. Note how it runs at a 45 degree angle to the joists, to increase structural strength. slides/DSC_0071.JPG DSC_0076 slides/DSC_0076.html# Fri, 22 Jan 2010 09:51:27 -0800 (L-R) Chris, Art, Lawrence, Mark and Bill at work on the Low Deck. It needed a completely new set of railings, posts, and selective replacement of deck boards. (L-R) Chris, Art, Lawrence, Mark and Bill at work on the Low Deck. It needed a completely new set of railings, posts, and selective replacement of deck boards. slides/DSC_0076.JPG DSC_0084 slides/DSC_0084.html# Fri, 22 Jan 2010 09:51:27 -0800 David trims floor ends on the High Deck. One piece is caught in the act of obeying gravity. David trims floor ends on the High Deck. One piece is caught in the act of obeying gravity. slides/DSC_0084.JPG DSC_0087 slides/DSC_0087.html# Fri, 22 Jan 2010 09:51:27 -0800 David, Leland and Stephen at work on the High Deck. David, Leland and Stephen at work on the High Deck. slides/DSC_0087.JPG DSC_0008 slides/DSC_0008.html# Fri, 22 Jan 2010 09:51:27 -0800 A hundred yards away, near the office building, John cuts pieces for the railing sections. A hundred yards away, near the office building, John cuts pieces for the railing sections. slides/DSC_0008.JPG DSC_0102 slides/DSC_0102.html# Fri, 22 Jan 2010 09:51:27 -0800 Lawrence and Mark prefabricate a railing section. These go between the posts, and when finished were carried to the cabin one at a time. Lawrence and Mark prefabricate a railing section. These go between the posts, and when finished were carried to the cabin one at a time. slides/DSC_0102.JPG DSC_0105 slides/DSC_0105.html# Fri, 22 Jan 2010 09:51:27 -0800 Lawrence and John sawing another piece for a railing section. Lawrence and John sawing another piece for a railing section. slides/DSC_0105.JPG DSC_0106 slides/DSC_0106.html# Fri, 22 Jan 2010 09:51:27 -0800 Bill is caught &#147;behind bars&#148; by the group&#146;s rather impish photographer. Bill is caught &#147;behind bars&#148; by the group&#146;s rather impish photographer. slides/DSC_0106.JPG DSC_0108 slides/DSC_0108.html# Fri, 22 Jan 2010 09:51:27 -0800 Gary and Mark (somewhat hidden) complete a railing section. Gary and Mark (somewhat hidden) complete a railing section. slides/DSC_0108.JPG DSC_0099 slides/DSC_0099.html# Fri, 22 Jan 2010 09:51:27 -0800 At the end of a workday, John and Lawrence prepare our supper. At the end of a workday, John and Lawrence prepare our supper. slides/DSC_0099.JPG DSC_0121 slides/DSC_0121.html# Fri, 22 Jan 2010 09:51:27 -0800 L-R around the dining table: Lawrence, Bill, Leland, Stephen, Chris, Art, John, Gary, Rod. Not shown: David. L-R around the dining table: Lawrence, Bill, Leland, Stephen, Chris, Art, John, Gary, Rod. Not shown: David. slides/DSC_0121.JPG DSC_0110 slides/DSC_0110.html# Fri, 22 Jan 2010 09:51:27 -0800 In the far back, the Low Deck is fitted with its first railing section. In the far back, the Low Deck is fitted with its first railing section. slides/DSC_0110.JPG DSC_0123 slides/DSC_0123.html# Fri, 22 Jan 2010 09:51:27 -0800 Several railing sections are now in place at the Low Deck. Several railing sections are now in place at the Low Deck. slides/DSC_0123.JPG DSC_0130 slides/DSC_0130.html# Fri, 22 Jan 2010 09:51:27 -0800 A post and its brace are set in place. Intricate fitting was needed to accomodate the large boulder just beneath. A post and its brace are set in place. Intricate fitting was needed to accomodate the large boulder just beneath. slides/DSC_0130.jpg DSC_0132 slides/DSC_0132.html# Fri, 22 Jan 2010 09:51:27 -0800 The post is toenailed into place. Note the boulder just behind the drill and hand. The post is toenailed into place. Note the boulder just behind the drill and hand. slides/DSC_0132.jpg DSC_0139 slides/DSC_0139.html# Fri, 22 Jan 2010 09:51:27 -0800 An old dog CAN learn new tricks. Here, Mark instructs his canine friend in the use of the drill. An old dog CAN learn new tricks. Here, Mark instructs his canine friend in the use of the drill. slides/DSC_0139.JPG DSC_0142 slides/DSC_0142.html# Fri, 22 Jan 2010 09:51:27 -0800 The Low Deck is finished. The Low Deck is finished. slides/DSC_0142.JPG DSC_0141 slides/DSC_0141.html# Fri, 22 Jan 2010 09:51:27 -0800 The High Deck is finished. The High Deck is finished. slides/DSC_0141.JPG DSC_0140 slides/DSC_0140.html# Fri, 22 Jan 2010 09:51:27 -0800 Mark and Rod pose after installing most of the railing sections on the High Deck. Mark and Rod pose after installing most of the railing sections on the High Deck. slides/DSC_0140.JPG DSC_0144 slides/DSC_0144.html# Fri, 22 Jan 2010 09:51:27 -0800 Leland surveys part of our completed project, from the High Deck. Leland surveys part of our completed project, from the High Deck. slides/DSC_0144.JPG DSC_0138 slides/DSC_0138.html# Fri, 22 Jan 2010 09:51:27 -0800 Another spectacular Lake Tahoe sunset, taken the evening just before we finished. Another spectacular Lake Tahoe sunset, taken the evening just before we finished. slides/DSC_0138.JPG